Clarity is Key – How Do You Serve a Valid Pay Less Notice?

Clarity is Key – How Do You Serve a Valid Pay Less Notice?

By: Kevin Greene and Ruth Chang

Advance JV (A Joint Venture between (1) Balfour Beatty Group Limited; and (2) MWH Treatment Limited); and Enisca Limited [2022] EWHC 1152 (TCC)

The parties in this case carried out works pursuant to an amended form of NEC3 Engineering and Construction Contract (Option A). The works consisted of the supply and installation of LV electrical equipment for design and construction of a new water treatment works and hydro-electric power generation facility in Cumbria.